Skip to main content

Reply to "The new FEC240"

My first thought was I wonder how long it would take to get a 250# load of butts up to temp (like 225) in 0 degree weather? A little surprised they left it at 36,000 BTU?

It took my 3 FEC 100's over 75 minutes to hit temp last night. Each had about 85# of butts on them and it was about 30 F in the garage.

Looks like a pretty cool machine though and a quite a bit less expensive than a FEC 300 Wink
×
×
×
×