I have run loads this size in mine before, and the times are about right.
If you feel your running out of time, you can crank the temp up some and not hurt the quality of the product.
I have placed the smaller butts on the lower racks and the larger on the top. Some will be done earlier, like you said.
The FEC100 will get it done.
Good luck