I finely got my FEC120 installed and operating in my shop.
I was on the form about three months ago asking questions about how to install it. All I got was mostly negativity. It seems to me that many people on here worry more about codes and permits then salving problems.
At the time I figured I had two options. Install a range hood system or install a short stove pipe that didn't create a draft. The following is what I proceeded with. I went to a local sheet metal shop and had them make a plenum that fit over both smoke vents. I installed it over the two vents by gluing it in place with high temp silicon sealer. I had it made 6 inches wide and tapered it a 6 inch round pipe at the top. Elbowed thru the wall and elbowed up with a screen and rain cap. I used a wall thru for stove pipe to get it away from anything flammable to go thru the wall.
Tested it with a 12 hour burn and it worked perfectly. Yesterday I did four (4)twelve pound Briskets and they are fantastic. Just the right amount of crust. Next burn will be a case of St Louie ribs.
Original Post